Attractive world-class facilities & specification
- Landmark tower building
- Large reception lobby with direct escalator access to jubilee line and jubilee park retail
- FAT VAV Air conditioning
- Metal tile suspended ceiling
- 200mm Raised floors
- 2.75m Floor to ceiling height
- 8 x 21 Person passenger lift in each of the 3 lift banks
- 2 x 3000kg and 1 x 1900kg Goods lifts
- Dual power feed into the building
- 5 x 2000kva Emergency generators
- Electrak power distribution system
- Cat VI cabling in situ
- Tenant UPS provision 50kva per floor
- Building capable of 1 person per 8 m² occupancy density
Click here to view launch event photography